Standardising turns a raw score into a z; half of real work runs the other way — a percentile, a cutoff or a critical value is chosen first, and the raw score that matches it must be produced. The reverse formula is one line: X = μ + zσ.
The method: X = μ + (z × σ). Multiply the z score by the standard deviation, then add the mean — and if z is negative, the multiplication produces a subtraction automatically. z = 1.28, μ = 500, σ = 100: X = 500 + 128 = 628.
Where the formula comes from
It is the z formula rearranged, nothing more: z = (X − μ) / σ → z × σ = X − μ → X = μ + zσ. Every symbol keeps its job — z locates the position in standard-deviation units, σ prices one unit in raw points, μ sets the origin. The z score formula page treats both directions together; this post is the reverse direction given room, because the problems that need it — cutoffs, boundaries, targets — have their own habits. You will usually arrive with a percentile or a tail area rather than a z: convert that to z first with the percentile to z score calculator or the reverse lookup, then apply X = μ + zσ once.
Three problems this solves
- The pass mark. A board will certify the top 10% of candidates (scores N(70, 8)). Top 10% is the 90th percentile, z = 1.2816, so the pass mark is 70 + 1.2816 × 8 = 80.25 — in practice, 81 on a whole-mark paper, with the rounding decision stated.
- The lower flag line. A screening tool flags the bottom 5% (μ = 100, σ = 15). Bottom 5% means z = −1.645, and X = 100 + (−1.645 × 15) = 75.3. Scores at or below 75 are flagged. The negative z doing the subtracting by itself is the sign discipline working as designed.
- The design target. A process must keep at most 1% of parts below a 240 g limit, with σ = 3 g. The 1st percentile has z = −2.326; the mean must satisfy 240 = μ − 2.326 × 3, so μ = 246.98 g. Manufacturers run this direction more than any other — the raw score being solved for is sometimes the mean itself.
Checks and slips
Round-trip check: whatever X you produce, standardise it back: (628 − 500) / 100 = 1.28 ✓. Ten seconds, catches everything. The classic slip is adding before multiplying — μ + z × σ is not (μ + z) × σ; with the first example, the wrong order gives (500 + 1.28) × 100 = 50,128, a number whose absurdity is the tell. The second slip is using a sample's x̄ and s where the problem's μ and σ belong, or the reverse; the formula does not care, but the answer does. Exam versions of this question are usually chained — percentile → z → raw — and each stage earns its own mark, which is why the calculation guide teaches the chain as one routine.
Also asked as: how to find raw score from z score · how to find the raw score · how to get raw score from z score · how to find x from z score.
Related questions
Frequently asked questions
What raw score is z = 0?
The mean itself: X = μ + 0 × σ = μ. Every "average" target in a reverse problem is this trivial case, and every non-trivial one is a deliberate distance from it.
Can a raw score from a negative z be negative?
Yes, if the scale allows it — temperatures, account balances, change scores. If the scale cannot go negative (marks, heights), a very negative z with a small mean signals an inconsistent problem setup rather than a real value.